MAI-CHANGES — Registry v0.10.1 · Data as of 20 October 2026

Evidence changes

What changed in the registry's documented record between its 12 published versions, from v0.1.0 to v0.10.1: records admitted or corrected, classifications changed, lifecycle stages recorded or changed, relationships documented, gaps opened and reassessed. 287 changes, 221 of them to documented findings.

Record changes, not events. Each entry describes a change to this registry's record. A record admitted in a version documents something that may have happened long before; a stage first recorded did not change. The dates below say which is which.

01How to read the dates

Sources checked
The version's as-of date: when the registry's sources were last checked for that version.
Source published
The source's own date, when it states one.
Retrieved
When the registry retrieved the source.
Event date
Not inferred. Where a record documents when something happened, it says so in its own text.

02Versions at a glance

Scroll horizontally to see all 6 columns.

VersionSources checkedFindings changedWording revisedEditorial or structuralWhat changed
v0.10.120 October 2026000No change to the documented record
v0.10.020 October 2026000No change to the documented record
v0.9.020 October 2026840evidence: 7, entity: 3, gap: 2
v0.8.020 October 20261520evidence: 9, entity: 4, gap: 4
v0.7.020 October 202611101evidence: 7, entity: 11, gap: 3, schema: 1
v0.6.019 October 202644190evidence: 9, entity: 31, relationship: 16, gap: 7
v0.5.019 October 2026190evidence: 2, entity: 3, relationship: 3, gap: 2
v0.4.119 October 2026000No change to the documented record
v0.4.019 October 20261411evidence: 2, entity: 8, gap: 6
v0.3.018 October 20264555evidence: 14, entity: 22, relationship: 15, schema: 4
v0.2.018 October 20268327evidence: 13, entity: 48, relationship: 24, schema: 7

Wording revised counts revisions whose effect on the finding is not judged automatically; each shows its before and after text. Editorial or structural covers formatting, schema and bookkeeping changes that leave every finding as it was.

03Machine-readable

changes.json lists every change with its class, materiality, subject, before and after values, evidence and dates, under schema version 1.0. Versions are identified by number, as-of date and the SHA-256 of their canonical content. It is computed from the repository's published history by tools/changes.py and listed in the manifest. The narrative history is the changelog.

v0.10.1 from v0.10.0 · sources checked 20 October 2026

No change to the documented record: this version changed the site, its tooling or its published derivations, not the evidence, entities, relationships or gaps.

v0.10.0 from v0.9.0 · sources checked 20 October 2026

No change to the documented record: this version changed the site, its tooling or its published derivations, not the evidence, entities, relationships or gaps.

v0.9.0 from v0.8.0 · sources checked 20 October 2026

Evidence records (7)

  • Evidence record admitted MAI-EV-0059 admitted: VERIFIED FACT: Finance law for 2025: investment appropriation for implementing the Maroc Digital strategy. Source published: 20 December 2024; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0060 admitted: VERIFIED FACT: Budget settlement law for 2024: investment expenditure of the Ministry Delegate in charge of Digital Transition (ministry-level total). Source published: 10 August 2026; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0061 admitted: VERIFIED FACT: Treasury report on 2025 budget execution: investment spending of the digital-transition ministry (ministry-level total). Source published: 29 January 2026; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0062 admitted: OFFICIAL TARGET: Finance ministry's note on the 2025 finance bill: Digital Morocco 2030 ranking objective stated on the EGDI. Source published: 18 October 2024; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0063 admitted: OFFICIAL TARGET: Ministry 2025 report: offshoring-sector targets of Circular 2025/15. Source published: 7 September 2026; retrieved by the registry: 20 October 2026.
  • Record wording revised MAI-EV-0046: record wording revised (verification note). On MAI-EV-0046.
    Before and after

    verification note

    Before: Independent measurement by the United Nations of the index that the Digital Morocco 2030 ranking objective (MAI-EV-0002) refers to. The page is not dated; its latest data are from the 2024 edition, which was published in the year the strategy was launched and so measures the position at the start of the strategy, not progress under it. No later edition had been published on the retrieval date. The page does not mention the strategy. The second excerpt is the Online Service Index row of the page's historical table, in the same edition order. The strategy's ranking objective refers to the Online Services Index component, not the overall index (MAI-EV-0049); the page gives that component's value but not its rank, so it neither confirms nor contradicts the strategy's 113th place for 2022. On the overall index, Morocco ranked 101st in 2022.

    After: Independent measurement by the United Nations of the index that the Digital Morocco 2030 ranking objective (MAI-EV-0002) refers to. The page is not dated; its latest data are from the 2024 edition, which was published in the year the strategy was launched and so measures the position at the start of the strategy, not progress under it. No later edition had been published on the retrieval date. The page does not mention the strategy. The second excerpt is the Online Service Index row of the page's historical table, in the same edition order. The strategy's ranking objective refers to the Online Services Index component, not the overall index (MAI-EV-0049); the page gives that component's value but not its rank, so it neither confirms nor contradicts the strategy's 113th place for 2022. On the overall index, Morocco ranked 101st in 2022. The survey's annex tables also publish the Online Services Index without a rank: table A.8 of the 2022 annexes and table 7 of the 2024 technical appendix give each country's value and components but no rank column, while ranks are published for the overall index and the e-participation index (checked on 20 October 2026). The registry does not compute a rank from the published values: these tables contain no United Nations rank on this index for it to record.

  • Record wording revised MAI-EV-0056: record wording revised (verification note). On MAI-EV-0056.
    Before and after

    verification note

    Before: A ministry-reported output: the registry has not checked it independently. It counts new enrolments in one university year, not graduates and not certified talents: it is not progress towards the 200,000 talents trained and certified of Morocco AI 2030 (MAI-EV-0011, MAI-EV-0058), nor towards the objective of 100,000 new digital talents trained each year (MAI-EV-0058). Report PDF dated 7 September 2026; passage on printed page 47, transcribed from the rendered page; the 2026 finance bill's presentation note gives the same two figures.

    After: A ministry-reported output: the registry has not checked it independently. It counts new enrolments in one university year, not graduates and not certified talents: it is not progress towards the 200,000 talents trained and certified of Morocco AI 2030 (MAI-EV-0011, MAI-EV-0058), nor towards the objective of 100,000 new digital talents trained each year (MAI-EV-0058). Report PDF dated 7 September 2026; passage on printed page 47, transcribed from the rendered page. The 2026 finance bill's presentation note gives the same two figures in its section on Digital Morocco 2030 (PDF page 58), but gives 22,258 new students for 2024–2025 in its higher-education section (PDF page 83), where both sections name the same programme for digital talents running to 2027; the registry records both figures and does not resolve the difference.

Entities (3)

  • Supporting records changed Digital Morocco 2030: supporting records changed. On MAI-EV-0059, MAI-EV-0062, MAI-EV-0063.
  • Description revised Digital Morocco 2030: description revised (summary).
    Before and after

    summary

    Before: National digital strategy launched on 25 September 2024. Its official targets include 240,000 direct jobs and a rise from 113th to 50th place worldwide on the United Nations ranking of online public services, which the strategy's brochure defines as the Online Services Index, a component of the e-government development index; the 113th place is the strategy's figure, not verified by the registry.

    After: National digital strategy launched on 25 September 2024. Its official targets include 240,000 direct jobs and a rise from 113th to 50th place worldwide on the United Nations ranking of online public services, which the strategy's brochure defines as the Online Services Index, a component of the e-government development index; the 113th place is the strategy's figure, not verified by the registry. The finance ministry's note on the 2025 finance bill states the same objective as the top 50 on the overall e-government development index; the registry does not reconcile the two.

  • Supporting records changed Ministry of Digital Transition and Administration Reform: supporting records changed. On MAI-EV-0059, MAI-EV-0060, MAI-EV-0061, MAI-EV-0063.

Evidence gaps (2)

  • Evidence gap reassessed GAP-06: evidence gap reassessed (assessed records). On MAI-EV-0059, MAI-EV-0062, MAI-EV-0063.
  • Gap wording revised GAP-06: gap wording revised (established, unestablished, evidence needed).
    Before and after

    unestablished

    Before: Any measured progress, after the strategy's launch, towards the jobs, GDP-contribution, public-services or online-services ranking objectives; Morocco's rank on the Online Services Index in any edition; and any amount actually spent on the strategy. The recorded finance-law figures are targets and an allocation, the ministry's figures are unverified outputs on other definitions, and the Court's finding predates the strategy. No edition of the United Nations survey later than 2024 had been published on the assessment date.

    After: Any measured progress, after the strategy's launch, towards the jobs, GDP-contribution, public-services or online-services ranking objectives; a rank on the Online Services Index published by the United Nations, whose 2022 and 2024 tables give values only; and any amount actually spent on the strategy: budget execution is recorded only as ministry-level totals, which are not spending on the strategy. The recorded finance-law figures are targets and allocations, the ministry's figures are unverified outputs or targets on other definitions, and the Court's finding predates the strategy. No edition of the United Nations survey later than 2024 had been published on the assessment date.

v0.8.0 from v0.7.0 · sources checked 20 October 2026

Evidence records (9)

  • Evidence record admitted MAI-EV-0050 admitted: OFFICIAL TARGET: Digital-transition performance project, 2023 finance bill: e-government ranking target. Source published: 11 September 2024; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0051 admitted: OFFICIAL TARGET: Digital-transition performance project, 2023 finance bill: jobs and digitalised-procedure targets. Source published: 11 September 2024; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0052 admitted: OFFICIAL TARGET: Digital-transition performance project, 2024 finance bill: e-government ranking target and baseline. Source published: 11 September 2024; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0053 admitted: OFFICIAL TARGET: Digital-transition performance project, 2024 finance bill: jobs-created target and definition. Source published: 11 September 2024; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0054 admitted: VERIFIED FACT: Finance law for 2026: investment appropriation for implementing the Maroc Digital strategy. Source published: 9 January 2026; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0055 admitted: UNVERIFIED CLAIM: Ministry 2025 report: offshoring-sector jobs at end-2024 (ministry-reported output). Source published: 7 September 2026; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0056 admitted: UNVERIFIED CLAIM: Ministry 2025 report: new enrolments in digital training, 2024–2025 (ministry-reported output). Source published: 7 September 2026; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0057 admitted: VERIFIED FACT: Cour des comptes annual report 2023–2024 (main points): digitalised public services at end-2023. Source published: November 2024; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0058 admitted: OFFICIAL TARGET: Ministry release: Morocco AI 2030 targets and the annual digital-talent objective. Source published: 8 September 2026; retrieved by the registry: 20 October 2026.

Entities (4)

Evidence gaps (4)

  • Evidence gap reassessed GAP-02: evidence gap reassessed (assessed records). On MAI-EV-0058.
  • Gap wording revised GAP-02: gap wording revised (established, unestablished, evidence needed).
    Before and after

    unestablished

    Before: Any measured progress towards the value-added, jobs or talent targets. A project's status is not a measure of progress towards them.

    After: Any measured progress towards the value-added, jobs or talent targets, and any published baseline or definition for them; no budget line specific to the roadmap is recorded. A project's status, a count of training enrolments or a yearly training objective is not a measure of progress towards them.

  • Evidence gap reassessed GAP-06: evidence gap reassessed (assessed records). On MAI-EV-0050, MAI-EV-0051, MAI-EV-0052, MAI-EV-0053, MAI-EV-0054, MAI-EV-0055, MAI-EV-0056, MAI-EV-0057.
  • Gap wording revised GAP-06: gap wording revised (established, unestablished, evidence needed).
    Before and after

    unestablished

    Before: Any measured progress, after the strategy's launch, towards the jobs, GDP-contribution, public-services or online-services ranking objectives, and Morocco's rank on the Online Services Index in any edition. No project is recorded as included in the strategy, the investment figure is an unchecked statement about spending, and no edition of the United Nations survey later than 2024 had been published on the assessment date.

    After: Any measured progress, after the strategy's launch, towards the jobs, GDP-contribution, public-services or online-services ranking objectives; Morocco's rank on the Online Services Index in any edition; and any amount actually spent on the strategy. The recorded finance-law figures are targets and an allocation, the ministry's figures are unverified outputs on other definitions, and the Court's finding predates the strategy. No edition of the United Nations survey later than 2024 had been published on the assessment date.

v0.7.0 from v0.6.0 · sources checked 20 October 2026

Evidence records (7)

  • Evidence record admitted MAI-EV-0048 admitted: VERIFIED FACT: Ministry release: general assemblies of four JAZARI institutes. Source published: 8 September 2026; retrieved by the registry: 20 October 2026.
  • Evidence record admitted MAI-EV-0049 admitted: OFFICIAL TARGET: Digital Morocco 2030 brochure: objectives, including the online-services ranking. Source published: 25 September 2024; retrieved by the registry: 20 October 2026.
  • Record wording revised MAI-EV-0002: record wording revised (claim, verification note). On MAI-EV-0002.
    Before and after

    claim

    Before: Digital Morocco 2030 sets the objectives of 240,000 direct jobs with a contribution to GDP in 2030, digitalising public services, and moving Morocco from 113th to 50th place worldwide in the e-government development index.

    After: Digital Morocco 2030 sets the objectives of 240,000 direct jobs with a contribution to GDP in 2030, digitalising public services, and moving Morocco from 113th to 50th place worldwide in what the dispatch calls the e-government development index.

    verification note

    Before: The source does not give a separate target year for the e-government ranking objective; 2030 is the strategy horizon. The starting point of 113th is the source's figure: no edition of the United Nations index ranks Morocco 113th, and it ranked 101st in 2022 and 90th in 2024 (MAI-EV-0046).

    After: The source does not give a separate target year for the e-government ranking objective; 2030 is the strategy horizon. The strategy's own brochure (MAI-EV-0049) defines the ranking as the United Nations Online Services Index (OSI), a component of the e-government development index (EGDI), and gives 113th as Morocco's 2022 position on it; describing it as the overall index is the dispatch's wording. The 113th place is the strategy's figure: the United Nations page recorded here gives Morocco's OSI values but not its OSI rank, so the registry has not verified it. On the overall EGDI, Morocco ranked 101st in 2022 and 90th in 2024 (MAI-EV-0046).

  • Record wording revised MAI-EV-0008: record wording revised (verification note). On MAI-EV-0008.
    Before and after

    verification note

    Before: Source is a signatory's own publication; it documents the signature, not the group's legal constitution. Press reports from August 2026 say approval decisions for four Jazari institutes were published in the Bulletin Officiel, but the Gazette text was not located (French translation edition issues 7522, 7526, 7532, 7536, 7540 and 7544 checked), so legal constitution is not recorded as verified.

    After: Source is a signatory's own publication; it documents the signature, not the group's legal constitution. When this record was made, the Gazette text approving the convention had not been located; it was later read and is recorded as MAI-EV-0047 (Bulletin Officiel 7534, joint order 1535.26 of 16 July 2026).

  • Source excerpts changed MAI-EV-0046: source excerpts changed (source excerpts). On MAI-EV-0046.
  • Record wording revised MAI-EV-0046: record wording revised (claim, title, verification note). On MAI-EV-0046.
    Before and after

    claim

    Before: The United Nations E-Government Knowledgebase ranks Morocco 90th of 193 countries in the 2024 E-Government Development Index, with a value of 0.6841, against 101st in 2022. Its ranks in the editions from 2024 back to 2003 are 90, 101, 106, 110, 85, 82, 120, 126, 140, 138, 138 and 131.

    After: The United Nations E-Government Knowledgebase ranks Morocco 90th of 193 countries in the 2024 E-Government Development Index, with a value of 0.6841, against 101st in 2022. Its ranks in the editions from 2024 back to 2003 are 90, 101, 106, 110, 85, 82, 120, 126, 140, 138, 138 and 131. The page also gives Morocco's Online Service Index value, 0.56184 in 2024 and 0.47210 in 2022, without a rank on that index.

    title

    Before: United Nations E-Government Development Index: Morocco's rank and value, 2003–2024

    After: United Nations E-Government Development Index and Online Service Index: Morocco, 2003–2024

    verification note

    Before: Independent measurement by the United Nations of the index that the Digital Morocco 2030 ranking objective (MAI-EV-0002) refers to. The page is not dated; its latest data are from the 2024 edition, which was published in the year the strategy was launched and so measures the position at the start of the strategy, not progress under it. No later edition had been published on the retrieval date. The page does not mention the strategy. No edition shows Morocco at 113th, the starting point given in the strategy's objective.

    After: Independent measurement by the United Nations of the index that the Digital Morocco 2030 ranking objective (MAI-EV-0002) refers to. The page is not dated; its latest data are from the 2024 edition, which was published in the year the strategy was launched and so measures the position at the start of the strategy, not progress under it. No later edition had been published on the retrieval date. The page does not mention the strategy. The second excerpt is the Online Service Index row of the page's historical table, in the same edition order. The strategy's ranking objective refers to the Online Services Index component, not the overall index (MAI-EV-0049); the page gives that component's value but not its rank, so it neither confirms nor contradicts the strategy's 113th place for 2022. On the overall index, Morocco ranked 101st in 2022.

  • Record wording revised MAI-EV-0047: record wording revised (verification note). On MAI-EV-0047.
    Before and after

    verification note

    Before: Official gazette, Arabic general edition, pages 5224 to 5229; the French translation edition had not been published on the retrieval date (French editions up to 7544 were checked). Excerpts were transcribed from the page images, because the PDF's text layer reverses Arabic word order; automated excerpt matching cannot be relied on for this record. The orders approve conventions that are annexed to the original orders; the gazette does not reproduce them and, as article 2 of each order provides, publishes only a summary of each. This registry has not obtained the signed texts. The record is a legal establishment act, not the signed text, and it gives no signing dates. Each group is created for thirty years with a statutory seat (JAZARI Industrie X.0 at the Euro-Mediterranean University of Fès). Legal establishment is not operation: the gazette does not show premises in use, staff or activity. The summaries name further founding members (for JAZARI ROOT, the Secretary-General of the Government, several ministries, national police, the CNDP, the Digital Development Agency and the Rabat-Salé-Kénitra regional council; for JAZARI EduTech and JAZARI Smart City, further ministries and public bodies; the Industrie X.0 summary names no members beyond the seven recorded here) that are not recorded as relationships here. No act concerns the Al Jazari institute in Nador.

    After: Official gazette, Arabic general edition, pages 5224 to 5229; the French translation edition had not been published on the retrieval date (French editions up to 7544 were checked). Excerpts were transcribed from the page images, because the PDF's text layer reverses Arabic word order; automated excerpt matching cannot be relied on for this record. The orders approve conventions that are annexed to the original orders; the gazette does not reproduce them and, as article 2 of each order provides, publishes only a summary of each. This registry has not obtained the signed texts. The record is a legal establishment act, not the signed text, and it gives no signing dates. Each group is created for thirty years with a statutory seat (JAZARI Industrie X.0 at the Euro-Mediterranean University of Fès). Legal establishment is not operation: the gazette does not show premises in use, staff or activity. The summaries name further founding members (for JAZARI ROOT, the Secretary-General of the Government, several ministries, national police, the CNDP, the Digital Development Agency and the Rabat-Salé-Kénitra regional council; for JAZARI EduTech and JAZARI Smart City, further ministries and public bodies; the Industrie X.0 summary names no members beyond the seven recorded here) that are not recorded as relationships here. This issue (Bulletin Officiel 7534) contains no act concerning the Al Jazari institute in Nador; that does not show that no such act exists elsewhere.

Entities (11)

  • Supporting records changed Digital Morocco 2030: supporting records changed. On MAI-EV-0049.
  • Description revised Digital Morocco 2030: description revised (summary).
    Before and after

    summary

    Before: National digital strategy launched on 25 September 2024. Its official targets include 240,000 direct jobs in 2030 and a rise from 113th to 50th place in the e-government development index.

    After: National digital strategy launched on 25 September 2024. Its official targets include 240,000 direct jobs and a rise from 113th to 50th place worldwide on the United Nations ranking of online public services, which the strategy's brochure defines as the Online Services Index, a component of the e-government development index; the 113th place is the strategy's figure, not verified by the registry.

  • Supporting records changed JAZARI EduTech: supporting records changed. On MAI-EV-0048.
  • Description revised JAZARI EduTech: description revised (status).
    Before and after

    status

    Before: Named by the ministry; its founding convention as a public-interest group was approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). Operation is not documented.

    After: Named by the ministry; its founding convention as a public-interest group was approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). The ministry states that its general assembly was held on 8 September 2026 (MAI-EV-0048); no director, board, staff, premises or activity is documented. Operation is not documented.

  • Supporting records changed JAZARI Industrie X.0: supporting records changed. On MAI-EV-0048.
  • Description revised JAZARI Industrie X.0: description revised (status).
    Before and after

    status

    Before: Founding convention signed 2026-03-10 and approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). Operation is not documented.

    After: Founding convention signed 2026-03-10 and approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). The ministry states that its general assembly was held on 8 September 2026 (MAI-EV-0048); no director, board, staff, premises or activity is documented. Operation is not documented.

  • Supporting records changed Institut Jazari ROOT: supporting records changed. On MAI-EV-0048.
  • Description revised Institut Jazari ROOT: description revised (status).
    Before and after

    status

    Before: Constitutive convention signed 2026-01-12 and approved by joint order of 16 July 2026, published in Bulletin Officiel 7534 (13 August 2026). Operation is not documented.

    After: Constitutive convention signed 2026-01-12 and approved by joint order of 16 July 2026, published in Bulletin Officiel 7534 (13 August 2026). The ministry states that its general assembly was held on 8 September 2026 (MAI-EV-0048); no director, board, staff, premises or activity is documented. Operation is not documented.

  • Supporting records changed JAZARI Smart City: supporting records changed. On MAI-EV-0048.
  • Description revised JAZARI Smart City: description revised (status).
    Before and after

    status

    Before: Named by the ministry; its founding convention as a public-interest group was approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). Operation is not documented.

    After: Named by the ministry; its founding convention as a public-interest group was approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). The ministry states that its general assembly was held on 8 September 2026 (MAI-EV-0048); no director, board, staff, premises or activity is documented. Operation is not documented.

  • Supporting records changed Ministry of Digital Transition and Administration Reform: supporting records changed. On MAI-EV-0048, MAI-EV-0049.

Evidence gaps (3)

  • Evidence gap opened GAP-07 opened: Which JAZARI institutes have documented governance, staff, premises, operational activity or outputs, beyond their founding agreements and legal approval?
  • Evidence gap reassessed GAP-06: evidence gap reassessed (assessed records). On MAI-EV-0049.
  • Gap wording revised GAP-06: gap wording revised (established, unestablished, evidence needed).
    Before and after

    unestablished

    Before: Any measured progress, after the strategy's launch, towards the jobs, GDP-contribution, public-services or e-government ranking objectives. No project is recorded as included in the strategy, the investment figure is an unchecked statement about spending, and no edition of the United Nations index later than 2024 had been published on the assessment date.

    After: Any measured progress, after the strategy's launch, towards the jobs, GDP-contribution, public-services or online-services ranking objectives, and Morocco's rank on the Online Services Index in any edition. No project is recorded as included in the strategy, the investment figure is an unchecked statement about spending, and no edition of the United Nations survey later than 2024 had been published on the assessment date.

Data contract (1)

  • New field in the data contract Data contract: field gap.entity_assessments added.

v0.6.0 from v0.5.0 · sources checked 19 October 2026

Evidence records (9)

  • Evidence record admitted MAI-EV-0042 admitted: VERIFIED FACT: GemMaroc: the preprint describing the GemMaroc fine-tuning runs. Source published: 20 May 2025; retrieved by the registry: 19 October 2026.
  • Evidence record admitted MAI-EV-0043 admitted: VERIFIED FACT: GeneLM: genomic language model trained on the Toubkal supercomputer. Source published: 3 July 2025; retrieved by the registry: 19 October 2026.
  • Evidence record admitted MAI-EV-0044 admitted: VERIFIED FACT: Ministry release: memorandum signed on the Nexus AI Factory platform. Source published: 8 April 2026; retrieved by the registry: 19 October 2026.
  • Evidence record admitted MAI-EV-0045 admitted: VERIFIED FACT: Ministry release: convention launching strategic studies for the Igoudar Dakhla green data-centre programme. Source published: 14 April 2026; retrieved by the registry: 19 October 2026.
  • Evidence record admitted MAI-EV-0046 admitted: VERIFIED FACT: United Nations E-Government Development Index: Morocco's rank and value, 2003–2024. Source published: no date stated by the source; retrieved by the registry: 19 October 2026.
  • Evidence record admitted MAI-EV-0047 admitted: VERIFIED FACT: Bulletin Officiel 7534: joint orders approving the founding conventions of four JAZARI institutes. Source published: 13 August 2026; retrieved by the registry: 19 October 2026.
  • Record wording revised MAI-EV-0002: record wording revised (verification note). On MAI-EV-0002.
    Before and after

    verification note

    Before: The source does not give a separate target year for the e-government ranking objective; 2030 is the strategy horizon.

    After: The source does not give a separate target year for the e-government ranking objective; 2030 is the strategy horizon. The starting point of 113th is the source's figure: no edition of the United Nations index ranks Morocco 113th, and it ranked 101st in 2022 and 90th in 2024 (MAI-EV-0046).

  • Record wording revised MAI-EV-0030: record wording revised (verification note). On MAI-EV-0030.
    Before and after

    verification note

    Before: Secondary press. The ministry's own release (mmsp.gov.ma) returned HTTP 403 to the verification environment. La Nouvelle Tribune (lnt.ma, 9 April 2026) reports the same signatories and phase figures. Consortium and partner names in promotional passages are not recorded. Nothing has been built according to these sources.

    After: Secondary press. The ministry's own release (mmsp.gov.ma) returned HTTP 403 to the verification environment when this record was made; it was later retrieved and is recorded as MAI-EV-0044. La Nouvelle Tribune (lnt.ma, 9 April 2026) reports the same signatories and phase figures. Consortium and partner names in promotional passages are not recorded. Nothing has been built according to these sources.

  • Record wording revised MAI-EV-0041: record wording revised (claim, verification note). On MAI-EV-0041.
    Before and after

    claim

    Before: A peer-reviewed article in The Journal of Supercomputing, by authors affiliated with Mohammed VI Polytechnic University's College of Computing, describes Toubkal's GPU partitions (NVIDIA A100 nodes from the initial 2022 deployment and H100 nodes added in 2025). It states that fine-tuning of transformer-based large language models and large-scale computational fluid dynamics simulations have been run on the system, and presents as a benchmark the fine-tuning runs, attributed to Belkasmi et al., that produced the GemMaroc Moroccan Darija language models.

    After: A peer-reviewed article in The Journal of Supercomputing, by authors affiliated with Mohammed VI Polytechnic University's College of Computing, describes Toubkal's GPU partitions (NVIDIA A100 nodes from the initial 2022 deployment and H100 nodes added in 2025). It states that fine-tuning of transformer-based large language models and large-scale computational fluid dynamics simulations have been run on the system, and presents as a benchmark the fine-tuning runs that produced the GemMaroc Moroccan Darija language models, which it attributes to "Belkasmi et al." while citing the GemMaroc preprint by Skiredj et al.

    verification note

    Before: Open-access article (CC BY 4.0), published online 3 October 2025. Every author lists an affiliation with the university that hosts and runs Toubkal, so the workload statement is the operator's own report, peer-reviewed but not independent. It documents specific fine-tuning runs (the GemMaroc study by Belkasmi et al., which the registry has not retrieved), not the scale, share or continuity of AI use. The article's user counts and utilisation figures are not recorded. Benchmark, accuracy and energy figures in the article are not recorded. The verified fact is what the article states. Excerpts were matched against the article page retrieved on the retrieval date; automated requests to the publisher can receive a bot-challenge page, which the source checker reports as blocked and does not bypass.

    After: Open-access article (CC BY 4.0), published online 3 October 2025. Every author lists an affiliation with the university that hosts and runs Toubkal, so the workload statement is the operator's own report, peer-reviewed but not independent. It documents specific fine-tuning runs, not the scale, share or continuity of AI use. The article names their authors "Belkasmi et al.", but its reference [57] is the GemMaroc preprint by Skiredj, Azhari, Atou, Tazi and Berrada (MAI-EV-0042); that preprint does not itself say where the runs were made. The article's statement that they ran on Toubkal comes from its own authors, none of whom is an author of the preprint. The article's user counts and utilisation figures are not recorded. Benchmark, accuracy and energy figures in the article are not recorded. The verified fact is what the article states. Excerpts were matched against the article page retrieved on the retrieval date; automated requests to the publisher can receive a bot-challenge page, which the source checker reports as blocked and does not bypass.

Entities (31)

  • Supporting records changed Al Akhawayn University in Ifrane: supporting records changed. On MAI-EV-0047.
  • Supporting records changed General Confederation of Moroccan Enterprises (CGEM): supporting records changed. On MAI-EV-0047.
  • Supporting records changed Data centres: supporting records changed. On MAI-EV-0045.
  • Supporting records changed Digital Morocco 2030: supporting records changed. On MAI-EV-0046.
  • Supporting records changed Sovereign green data-centre infrastructure agreement: supporting records changed. On MAI-EV-0045.
  • Description revised Sovereign green data-centre infrastructure agreement: description revised (status).
    Before and after

    status

    Before: Agreement signed July 2025. No facility documented.

    After: Agreement signed July 2025. In April 2026 a follow-on convention launched strategic studies for a green data-centre programme in Dakhla (Igoudar); no facility is documented as built.

  • Supporting records changed JAZARI EduTech: supporting records changed. On MAI-EV-0047.
  • Description revised JAZARI EduTech: description revised (status).
    Before and after

    status

    Before: Named only. No founding convention, nor any signing of one, is documented in the registry.

    After: Named by the ministry; its founding convention as a public-interest group was approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). Operation is not documented.

  • Supporting records changed JAZARI Industrie X.0: supporting records changed. On MAI-EV-0047.
  • Description revised JAZARI Industrie X.0: description revised (status).
    Before and after

    status

    Before: Founding convention signed 2026-03-10. Operational status not verified.

    After: Founding convention signed 2026-03-10 and approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). Operation is not documented.

  • Description revised JAZARI Institutes network: description revised (status).
    Before and after

    status

    Before: Announced in January 2026. Signings of founding conventions are reported for JAZARI ROOT and JAZARI Industrie X.0; their signed texts are not recorded, and no institute is documented as constituted or operating.

    After: Announced in January 2026. The founding conventions of JAZARI ROOT, JAZARI Industrie X.0, JAZARI Smart City and JAZARI EduTech were approved by joint orders in July 2026 (Bulletin Officiel 7534); the Bulletin Officiel publishes only summaries of the conventions, not their signed texts, which this registry has not obtained; no institute is documented as operating.

  • Supporting records changed Institut Jazari ROOT: supporting records changed. On MAI-EV-0047.
  • Description revised Institut Jazari ROOT: description revised (status).
    Before and after

    status

    Before: Constitutive convention signed 2026-01-12. Legal constitution (approval in the Bulletin Officiel) not verified.

    After: Constitutive convention signed 2026-01-12 and approved by joint order of 16 July 2026, published in Bulletin Officiel 7534 (13 August 2026). Operation is not documented.

  • Supporting records changed JAZARI Smart City: supporting records changed. On MAI-EV-0047.
  • Description revised JAZARI Smart City: description revised (status).
    Before and after

    status

    Before: Named only. No founding convention, nor any signing of one, is documented in the registry.

    After: Named by the ministry; its founding convention as a public-interest group was approved by joint order of 22 July 2026, published in Bulletin Officiel 7534 (13 August 2026). Operation is not documented.

  • Supporting records changed Large language models: supporting records changed. On MAI-EV-0042.
  • Supporting records changed Ministry of Digital Transition and Administration Reform: supporting records changed. On MAI-EV-0044, MAI-EV-0045, MAI-EV-0047.
  • Supporting records changed Ministry of Economy and Finance: supporting records changed. On MAI-EV-0047.
  • Supporting records changed Ministry of Energy Transition and Sustainable Development: supporting records changed. On MAI-EV-0045.
  • Supporting records changed Ministry of Industry and Commerce: supporting records changed. On MAI-EV-0047.
  • Supporting records changed Nexus AI Factory: supporting records changed. On MAI-EV-0044.
  • Description revised Nexus AI Factory: description revised (status, summary).
    Before and after

    status

    Before: Announced (memorandum, April 2026). Nothing built according to the recorded sources.

    After: Announced (memorandum signed April 2026). No construction, commissioning or operation is documented in the recorded sources.

    summary

    Before: Planned AI and high-performance computing platform covered by a memorandum signed at GITEX Africa 2026, with a first phase at Nouaceur (MAD 5 billion, 16 MW initial capacity) according to press reports.

    After: Planned AI and high-performance computing platform covered by a memorandum of understanding signed at GITEX Africa 2026 by Nexus Core Systems, the Ministry of Digital Transition, the investment ministry and AMDIE, according to the ministry. The ministry states a first phase at Nouaceur (MAD 5 billion, 16 MW) as a commitment.

  • Supporting records changed Nexus Core Systems: supporting records changed. On MAI-EV-0044.
  • Supporting records changed Public administration and e-government: supporting records changed. On MAI-EV-0046.
  • Documented attributes changed Toubkal supercomputer: documented attributes changed (attributes). On MAI-EV-0043.
  • Supporting records changed Toubkal supercomputer: supporting records changed. On MAI-EV-0042, MAI-EV-0043.
  • Description revised Toubkal supercomputer: description revised (summary).
    Before and after

    summary

    Before: High-performance computing system at the African Supercomputing Centre of Mohammed VI Polytechnic University, installed in 2020 and listed in the June 2026 TOP500 at rank 409, with 71,232 cores and a 3.16 PFlop/s Linpack result. It is general-purpose computing infrastructure with CPU and GPU partitions. Authors affiliated with its host university report that fine-tuning of large language models has been run on it; no specific AI application, its scale or its users are documented in this registry.

    After: High-performance computing system at the African Supercomputing Centre of Mohammed VI Polytechnic University, installed in 2020 and listed in the June 2026 TOP500 at rank 409, with 71,232 cores and a 3.16 PFlop/s Linpack result. It is general-purpose computing infrastructure with CPU and GPU partitions. Authors affiliated with its host university report AI workloads run on it, including the training of a genomic language model; no independent documentation of its AI use, nor its scale or users, is recorded in this registry.

  • Supporting records changed Euro-Mediterranean University of Fès: supporting records changed. On MAI-EV-0047.
  • Supporting records changed Mohammed VI Polytechnic University (UM6P): supporting records changed. On MAI-EV-0042, MAI-EV-0043.
  • Supporting records changed Moulay Ismail University, Meknès: supporting records changed. On MAI-EV-0047.
  • Supporting records changed Sidi Mohammed Ben Abdellah University, Fès: supporting records changed. On MAI-EV-0047.

Relationships (16)

Evidence gaps (7)

  • Evidence gap reassessed GAP-03: evidence gap reassessed (assessed records). On MAI-EV-0042, MAI-EV-0043.
  • Gap wording revised GAP-03: gap wording revised (established, unestablished, evidence needed).
    Before and after

    unestablished

    Before: Independent documentation of AI workloads on Toubkal, and the scale, share, users or continuity of AI use. This is not a finding that Toubkal is not used for AI: its operator's own authors report specific fine-tuning runs. What is missing is independent and quantified documentation.

    After: Independent documentation of AI workloads on Toubkal, and the scale, share, users or continuity of its AI use. This is not a finding that Toubkal is not used for AI: researchers affiliated with its operator report specific runs. What is missing is documentation by a party independent of the operator, and system-level, quantified reporting.

  • Evidence gap reassessed GAP-04: evidence gap reassessed (assessed records). On MAI-EV-0044, MAI-EV-0045.
  • Gap wording revised GAP-04: gap wording revised (established, unestablished).
    Before and after

    unestablished

    Before: Construction, commissioning or operation of any of these facilities.

    After: Construction, commissioning or operation of any of these facilities. A memorandum, a convention or the launch of studies is not construction.

  • Gap wording revised GAP-05: gap wording revised (unestablished).
    Before and after

    unestablished

    Before: Any record other than an announcement, news report or description for each relationship listed below. Relationships not listed cite at least one other kind of record, such as an official report; for a signature that is still a report of the signing, not the signed text, which this registry does not record for any signature. This measures how each relationship is documented in this registry, not whether it is true.

    After: Any record other than an announcement, news report or description for each relationship listed below. Relationships not listed cite at least one other kind of record, such as an official report or a technical repository. For eight signatures of the JAZARI ROOT and JAZARI Industrie X.0 conventions, that record is the Bulletin Officiel's publication of the conventions' approval by joint order, with a summary naming their parties; the other signatures not listed rest on an official report of the signing. Neither is the signed text, which this registry does not record for any signature. This measures how each relationship is documented in this registry, not whether it is true.

  • Evidence gap reassessed GAP-06: evidence gap reassessed (assessed records). On MAI-EV-0046.
  • Gap wording revised GAP-06: gap wording revised (established, unestablished, evidence needed).
    Before and after

    unestablished

    Before: Any measured progress towards the jobs, GDP-contribution, public-services or e-government ranking objectives. No project is recorded as included in the strategy, and the investment figure is an unchecked statement about spending, not progress towards a target.

    After: Any measured progress, after the strategy's launch, towards the jobs, GDP-contribution, public-services or e-government ranking objectives. No project is recorded as included in the strategy, the investment figure is an unchecked statement about spending, and no edition of the United Nations index later than 2024 had been published on the assessment date.

v0.5.0 from v0.4.1 · sources checked 19 October 2026

Evidence records (2)

  • Record wording revised MAI-EV-0010: record wording revised (verification note). On MAI-EV-0010.
    Before and after

    verification note

    Before: Coverage of all twelve regions is an announced design. The registry documents signed instruments for JAZARI ROOT (MAI-EV-0008) and JAZARI Industrie X.0 (MAI-EV-0009) only.

    After: Coverage of all twelve regions is an announced design. The registry records reported signings of founding conventions for JAZARI ROOT (MAI-EV-0008) and JAZARI Industrie X.0 (MAI-EV-0009) only; neither signed text is recorded.

  • Record wording revised MAI-EV-0012: record wording revised (verification note). On MAI-EV-0012.
    Before and after

    verification note

    Before: The fact recorded is how the ministry described the roadmap's structure. The registry has no separate signed instrument for JAZARI Smart City or JAZARI EduTech.

    After: The fact recorded is how the ministry described the roadmap's structure. The registry records no founding convention, nor any signing of one, for JAZARI Smart City or JAZARI EduTech.

Entities (3)

  • Description revised JAZARI EduTech: description revised (status).
    Before and after

    status

    Before: Named only. No founding instrument documented in the registry.

    After: Named only. No founding convention, nor any signing of one, is documented in the registry.

  • Description revised JAZARI Institutes network: description revised (status, summary).
    Before and after

    status

    Before: Announced in January 2026. Signed founding instruments are documented for JAZARI ROOT and JAZARI Industrie X.0.

    After: Announced in January 2026. Signings of founding conventions are reported for JAZARI ROOT and JAZARI Industrie X.0; their signed texts are not recorded, and no institute is documented as constituted or operating.

    summary

    Before: Network of AI institutes of excellence that the ministry describes as the operational arm of Morocco AI 2030 for research and innovation. It was announced as covering the twelve regions, with JAZARI ROOT as its core.

    After: Announced network of AI institutes of excellence that the ministry describes as the operational arm of Morocco AI 2030 for research and innovation. It was announced as covering the twelve regions, with JAZARI ROOT as its core.

  • Description revised JAZARI Smart City: description revised (status).
    Before and after

    status

    Before: Named only. No founding instrument documented in the registry.

    After: Named only. No founding convention, nor any signing of one, is documented in the registry.

Relationships (3)

  • Relationship note revised JAZARI Institutes network includes JAZARI EduTech: relationship note revised (note).
    Before and after

    note

    Before: Named as a component by the ministry; no founding instrument is documented.

    After: Named as a component by the ministry; no founding convention, nor any signing of one, is documented.

  • Relationship note revised JAZARI Institutes network includes JAZARI Smart City: relationship note revised (note).
    Before and after

    note

    Before: Named as a component by the ministry; no founding instrument is documented.

    After: Named as a component by the ministry; no founding convention, nor any signing of one, is documented.

  • Relationship note revised Morocco AI 2030 implemented through JAZARI Institutes network: relationship note revised (note).
    Before and after

    note

    Before: none

    After: The ministry's description of how the roadmap is to be implemented; implementation through the network is not documented.

Evidence gaps (2)

  • Evidence gap opened GAP-06 opened: What publicly documented measurements show progress toward the official targets of Digital Morocco 2030?
  • Gap wording revised GAP-05: gap wording revised (unestablished).
    Before and after

    unestablished

    Before: The instrument or formal record behind each relationship listed below: the signed text, founding act, designation, investment or operating record. This measures how each relationship is documented in this registry, not whether it is true: an official report of a signing is good evidence that a signing was announced, not of what the instrument says.

    After: Any record other than an announcement, news report or description for each relationship listed below. Relationships not listed cite at least one other kind of record, such as an official report; for a signature that is still a report of the signing, not the signed text, which this registry does not record for any signature. This measures how each relationship is documented in this registry, not whether it is true.

v0.4.1 from v0.4.0 · sources checked 19 October 2026

No change to the documented record: this version changed the site, its tooling or its published derivations, not the evidence, entities, relationships or gaps.

v0.4.0 from v0.3.0 · sources checked 19 October 2026

Evidence records (2)

  • Evidence record admitted MAI-EV-0040 admitted: VERIFIED FACT: Maroc IA 2030: presentation of the roadmap's "main advances". Source published: 9 September 2026; retrieved by the registry: 19 October 2026.
  • Evidence record admitted MAI-EV-0041 admitted: VERIFIED FACT: TOUBKAL: peer-reviewed description of the system and its reported workloads. Source published: 3 October 2025; retrieved by the registry: 19 October 2026.

Entities (8)

  • Supporting records changed Idarati AI: supporting records changed. On MAI-EV-0040.
  • Supporting records changed Ministry of Digital Transition and Administration Reform: supporting records changed. On MAI-EV-0040.
  • Supporting records changed Morocco AI 2030: supporting records changed. On MAI-EV-0040.
  • Supporting records changed Sovereign AI marketplace: supporting records changed. On MAI-EV-0040.
  • Documented attributes changed Toubkal supercomputer: documented attributes changed (attributes). On MAI-EV-0041.
  • Supporting records changed Toubkal supercomputer: supporting records changed. On MAI-EV-0041.
  • Description revised Toubkal supercomputer: description revised (summary).
    Before and after

    summary

    Before: High-performance computing system at the African Supercomputing Centre of Mohammed VI Polytechnic University, installed in 2020 and listed in the June 2026 TOP500 at rank 409, with 71,232 cores and a 3.16 PFlop/s Linpack result. It is general-purpose computing infrastructure; no specific AI application running on it is documented in this registry.

    After: High-performance computing system at the African Supercomputing Centre of Mohammed VI Polytechnic University, installed in 2020 and listed in the June 2026 TOP500 at rank 409, with 71,232 cores and a 3.16 PFlop/s Linpack result. It is general-purpose computing infrastructure with CPU and GPU partitions. Authors affiliated with its host university report that fine-tuning of large language models has been run on it; no specific AI application, its scale or its users are documented in this registry.

  • Supporting records changed Mohammed VI Polytechnic University (UM6P): supporting records changed. On MAI-EV-0041.

Evidence gaps (6)

  • Gap register begins The gap register begins with 5 gaps; earlier versions had none.
  • Evidence gap opened GAP-01 opened: What documents actual use, adoption, accuracy, service outcomes or sustained operation of Idarati AI?
  • Evidence gap opened GAP-02 opened: What publicly documented measurements show progress toward the official targets of Morocco AI 2030?
  • Evidence gap opened GAP-03 opened: What independently documents AI workloads on the Toubkal supercomputer, and at what scale?
  • Evidence gap opened GAP-04 opened: Which announced or signed computing and data-centre initiatives have verifiable construction, commissioning or operation?
  • Evidence gap opened GAP-05 opened: Which relationships asserting a formal act (a signature, creation, designation, investment, development or operation) rest only on announcements, news reports or descriptions in this registry?

v0.3.0 from v0.2.0 · sources checked 18 October 2026

Evidence records (14)

  • Evidence record admitted MAI-EV-0032 admitted: VERIFIED FACT: FDA 510(k) premarket notification K242594: DEEPECHO. Source published: 23 May 2025; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0033 admitted: VERIFIED FACT: Ministry of Health convention with DeepEcho on AI prenatal ultrasound in public facilities. Source published: 6 May 2026; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0034 admitted: VERIFIED FACT: Ministry AI Marketplace portal listing Idarati AI. Source published: no date stated by the source; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0035 admitted: VERIFIED FACT: Idarati national procedures portal embedding the Assistant Idarati chatbot. Source published: no date stated by the source; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0036 admitted: ANNOUNCED PLAN: Switch Al Maghrib to integrate Visa's AI-based real-time fraud scoring. Source published: 26 March 2026; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0037 admitted: VERIFIED FACT: Switch Al Maghrib: self-description in its press release. Source published: 26 March 2026; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0038 admitted: VERIFIED FACT: Assistant Citoyen at chatbot.idarati.ma: live service observation. Source published: no date stated by the source; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0039 admitted: VERIFIED FACT: FDA 510(k) K242594: clearance letter and 510(k) summary for DEEPECHO. Source published: 23 May 2025; retrieved by the registry: 18 October 2026.
  • Property first recorded on an existing record MAI-EV-0020: property first recorded on an existing record (status basis). On MAI-EV-0020.
  • Source excerpts changed MAI-EV-0028: source excerpts changed (source excerpts). On MAI-EV-0028.
  • Record wording revised MAI-EV-0028: record wording revised (claim, verification note). On MAI-EV-0028.
    Before and after

    claim

    Before: UM6P Ventures' case study states that DeepEcho, a Morocco-based startup applying machine learning to prenatal ultrasound diagnosis, emerged from the AIOX Labs startup studio, and that UM6P Ventures invested in its pre-seed round.

    After: UM6P Ventures' case study states that DeepEcho, a Morocco-based startup applying machine learning to prenatal ultrasound diagnosis, emerged from the AIOX Labs startup studio, that UM6P Ventures invested in its pre-seed round, and that the startup was then in the process of an FDA submission.

    verification note

    Before: Investor's own publication; the PDF metadata gives a creation date of 8 May 2023. It is independent of DeepEcho but not of the investment it describes. Its accuracy figure and its statement about agreements with health centres are not recorded, as they were not independently checked. Company registration and headquarters address are not documented.

    After: Investor's own publication; the PDF metadata gives a creation date of 8 May 2023. It is independent of DeepEcho but not of the investment it describes. Its accuracy figure and its statement about agreements with health centres are not recorded, as they were not independently checked. Company registration and headquarters address are not documented. Its 2023 statement about an FDA submission is consistent with, but does not by itself identify, the applicant of FDA 510(k) K242594 (MAI-EV-0032).

  • Record metadata changed MAI-EV-0029: record metadata changed (status evidence). On MAI-EV-0029.
  • Record marked as superseded MAI-EV-0029 marked as superseded by MAI-EV-0032, MAI-EV-0039.
  • Record wording revised MAI-EV-0029: record wording revised (verification note). On MAI-EV-0029.
    Before and after

    verification note

    Before: The company's own disclaimer is the basis for recording the software as in development: it states that clinical studies are under scientific and regulatory review and that claims are not FDA-validated. No regulatory clearance (FDA, Moroccan or other) and no clinical or commercial deployment is documented in the registry. Accuracy and speed figures on the site are self-reported and not recorded.

    After: The disclaimer is quoted as the site showed it on the retrieval date, but it appears outdated: the FDA database lists 510(k) clearance K242594 for a DEEPECHO device on 23 May 2025 (MAI-EV-0032, MAI-EV-0039), and the Moroccan government says DeepEcho's solution obtained FDA "approbation" (MAI-EV-0033). It is therefore no longer used to establish a lifecycle stage: a quotation that still matches its source can support a claim that is no longer current. Accuracy and speed figures on the site are self-reported and not recorded.

Entities (22)

  • Entity added DeepEcho AI prenatal ultrasound evaluation in public health facilities added (project). On MAI-EV-0033.
  • Entity added Financial services and payments added (sector). On MAI-EV-0036.
  • Entity added Ministry of Health and Social Protection added (institution). On MAI-EV-0033.
  • Entity added Switch Al Maghrib (SWAM) added (company). On MAI-EV-0036, MAI-EV-0037.
  • Entity added AI-based real-time fraud scoring on Morocco's national card switch added (project). On MAI-EV-0036.
  • Supporting records changed Agentic AI assistants: supporting records changed. On MAI-EV-0034.
  • Supporting records changed DeepEcho: supporting records changed. On MAI-EV-0032, MAI-EV-0033, MAI-EV-0039.
  • Supporting records changed DeepEcho AI ultrasound software: supporting records changed. On MAI-EV-0032, MAI-EV-0033, MAI-EV-0039.
  • Property first recorded on an existing entity DeepEcho AI ultrasound software: property first recorded on an existing entity (attributes, note).
  • Lifecycle stage changed DeepEcho AI ultrasound software: lifecycle stage changed from in-development to unresolved. On MAI-EV-0029, MAI-EV-0032, MAI-EV-0033.
  • Description revised DeepEcho AI ultrasound software: description revised (status, summary).
    Before and after

    status

    Before: In development: clinical studies under scientific and regulatory review according to its developer. No regulatory clearance or deployment documented.

    After: Unresolved: an associated US 510(k) clearance is documented (May 2025), but no clinical or commercial use in Morocco is documented, and the developer's own site gives an outdated regulatory status.

    summary

    Before: Software that uses deep learning to assist ultrasound video diagnosis in prenatal care, including automated fetal measurements. Its developer states that its claims are not yet validated by the FDA and that its clinical studies are under scientific and regulatory review.

    After: Software that uses deep learning to assist ultrasound video diagnosis in prenatal care. On 23 May 2025 the FDA cleared a device named DEEPECHO under 510(k) K242594, for an applicant named DeepEcho with a Delaware address; the registry associates that record with this software by name, device type, web domain and Moroccan data sites, not by a documented legal identity. The Moroccan government says DeepEcho's solution obtained FDA "approbation"; the company's own website still carries an older disclaimer saying its claims are not FDA-validated. A Moroccan public-sector evaluation is planned under a May 2026 convention.

  • Supporting records changed Health: supporting records changed. On MAI-EV-0033.
  • Supporting records changed Idarati AI: supporting records changed. On MAI-EV-0034, MAI-EV-0035, MAI-EV-0038.
  • Property first recorded on an existing entity Idarati AI: property first recorded on an existing entity (attributes).
  • Lifecycle stage changed Idarati AI: lifecycle stage changed from announced to operational. On MAI-EV-0034, MAI-EV-0035, MAI-EV-0038.
  • Description revised Idarati AI: description revised (status, summary).
    Before and after

    status

    Before: Presented September 2026. Public availability not verified.

    After: Operational on the basis of public availability: the operator's own services showed it live and responding on 2026-10-18. How many people use it, its accuracy and its outcomes are not documented, and operation after that date has not been reconfirmed.

    summary

    Before: Agentic AI assistant presented in September 2026, intended to inform, guide and assist users with administrative procedures.

    After: Agentic AI assistant for administrative procedures, presented by the Ministry of Digital Transition in September 2026. On 18 October 2026 it was publicly available on the ministry's own services: listed on its AI Marketplace, opened from an "Assistant Idarati" button on the national procedures portal idarati.ma, and answering a test question at chatbot.idarati.ma.

  • Supporting records changed Ministry of Digital Transition and Administration Reform: supporting records changed. On MAI-EV-0034, MAI-EV-0035, MAI-EV-0038.
  • Supporting records changed Public administration and e-government: supporting records changed. On MAI-EV-0034.
  • Type, kind, origin or domain changed Sovereign AI marketplace: type, kind, origin or domain changed (project kind).
  • Supporting records changed Sovereign AI marketplace: supporting records changed. On MAI-EV-0034.
  • Lifecycle stage changed Sovereign AI marketplace: lifecycle stage changed from announced to operational. On MAI-EV-0034.
  • Description revised Sovereign AI marketplace: description revised (status, summary).
    Before and after

    status

    Before: Presented September 2026. Public availability not verified.

    After: Operational digital platform, on the basis of public availability observed on 2026-10-18.

    summary

    Before: Platform unveiled by the ministry in September 2026, intended to give access to secure and trusted AI solutions with data protection and infrastructure control in Morocco.

    After: Ministry portal giving access to AI solutions it describes as secure and trusted, unveiled in September 2026 and publicly accessible at ai.mmsp.gov.ma on 18 October 2026. It is a catalogue platform, not itself an AI system; the products it lists are recorded individually only where their use is documented.

Relationships (15)

Data contract (4)

  • New field in the data contract Data contract: field record.associated_entities added.
  • New field in the data contract Data contract: field record.source_entity added.
  • New field in the data contract Data contract: field record.status_basis added.
  • New field in the data contract Data contract: field record.superseded_by added.

v0.2.0 from v0.1.0 · sources checked 18 October 2026

Evidence records (13)

  • Evidence record admitted MAI-EV-0019 admitted: VERIFIED FACT: Agreements signed in Salé on the sidelines of the First National AI Conference. Source published: 3 July 2025; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0020 admitted: VERIFIED FACT: Toubkal supercomputer in the June 2026 TOP500 list. Source published: June 2026; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0021 admitted: VERIFIED FACT: Atlas-Chat: Adapting Large Language Models for Low-Resource Moroccan Arabic Dialect (arXiv:2409.17912). Source published: 26 September 2024; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0022 admitted: VERIFIED FACT: Atlas-Chat-9B model card. Source published: 13 September 2024; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0023 admitted: VERIFIED FACT: Darija-SFT-Mixture dataset card. Source published: 18 September 2024; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0024 admitted: VERIFIED FACT: DarijaBERT model card. Source published: no date stated by the source; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0025 admitted: VERIFIED FACT: Al-Atlas-0.5B model card. Source published: 5 March 2025; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0026 admitted: VERIFIED FACT: AtlasIA website: self-description. Source published: no date stated by the source; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0027 admitted: VERIFIED FACT: AIOX Labs website: self-description and portfolio. Source published: no date stated by the source; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0028 admitted: VERIFIED FACT: UM6P Ventures case study: DeepEcho. Source published: May 2023; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0029 admitted: VERIFIED FACT: DeepEcho website: product description and regulatory disclaimer. Source published: no date stated by the source; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0030 admitted: ANNOUNCED PLAN: Nexus AI Factory memorandum signed at GITEX Africa 2026 (press report). Source published: 9 April 2026; retrieved by the registry: 18 October 2026.
  • Evidence record admitted MAI-EV-0031 admitted: VERIFIED FACT: INSEA website: institutional identity. Source published: no date stated by the source; retrieved by the registry: 18 October 2026.

Entities (48)

Relationships (24)

Data contract (7)

  • New field in the data contract Data contract: field record.status_evidence added.
  • New field in the data contract Data contract: field entity.attributes added.
  • New field in the data contract Data contract: field entity.lifecycle added.
  • New field in the data contract Data contract: field entity.lifecycle_evidence added.
  • New field in the data contract Data contract: field entity.origin added.
  • New field in the data contract Data contract: field entity.origin_evidence added.
  • New field in the data contract Data contract: field entity.project_kind added.