Project · Infrastructure, computing capacity and data sovereignty
Sovereign green data-centre infrastructure agreement
Agreement signed at the July 2025 National AI Conference with the Ministry of Energy Transition and Sustainable Development, on sustainable, high-performing and sovereign digital infrastructure (green data centres).
- Type
- Project
- Domain
- Infrastructure, computing capacity and data sovereignty
- Kind
- Agreement
- Lifecycle
- Announced · MAI-EV-0006 MAI-EV-0019
- Status
- Agreement signed July 2025. In April 2026 a follow-on convention launched strategic studies for a green data-centre programme in Dakhla (Igoudar); no facility is documented as built.
- Identifier
green-data-centres-agreement- Records
- 3
01Documented relationships
- appliesData centresTechnologyANNOUNCED PLANMAI-EV-0006
- concluded atFirst National AI Conference (Assises nationales de l'IA)EventVERIFIED FACTMAI-EV-0006
- signed byMinistry of Digital Transition and Administration ReformInstitutionVERIFIED FACTMAI-EV-0006
- signed byMinistry of Energy Transition and Sustainable DevelopmentInstitutionVERIFIED FACTMAI-EV-0006 MAI-EV-0019
02Evidence
-
MAI-EV-0045VERIFIED FACT
Ministry release: convention launching strategic studies for the Igoudar Dakhla green data-centre programme
The ministry states that a partnership convention signed at the 4th GITEX Africa Morocco, by the digital-transition and energy-transition ministries, the Dakhla-Oued Eddahab wilaya and regional council, the Mohammed VI Investment Fund and CDG Group, officially launches the strategic studies for the "Igoudar Dakhla" programme of green data centres, which it presents as following the agreement concluded at the July 2025 National AI Conference and an agreement signed in Dakhla in November 2025.
“Dans le prolongement de l’accord conclu le 1er juillet 2025 à l’occasion des Assises Nationales de l’intelligence artificielle visant à créer des synergies entre les stratégies nationales de transition numérique et énergétique”
“un complexe de centres de données verts de nouvelle génération, avec une capacité cible de 500 mégawatts”
“Cette convention constitue une étape majeure dans la concrétisation du programme « Igoudar Dakhla », en actant le lancement officiel des études stratégiques, prérequis essentiel à la mise en œuvre effective de ce projet structurant.”
Release by a signatory, dated 14 April 2026; the verified fact is the signature of the convention and its stated purpose, the launch of studies. Studies are a prerequisite to the project, not construction, commissioning or operation, and the 500-megawatt capacity is a stated aim. The release dates the National AI Conference agreement to 1 July 2025; the ministry's own release of the signing and the national portal's dispatch (MAI-EV-0019) give 2 July 2025, which the registry keeps. That this programme follows from that agreement is the ministry's statement.
-
MAI-EV-0006VERIFIED FACT
Synthesis report: agreement on sovereign green data-centre infrastructure
Among the conventions signed at the First National AI Conference was an agreement with the Ministry of Energy Transition and Sustainable Development on establishing sustainable, high-performing and sovereign digital infrastructures (green data centres).
“the Minister Delegate for the Head of Government in Charge of Digital Transition and Administrative Reform officially signed several important agreements and memoranda during the event or at the closing ceremony.”
“The Ministry of Energy Transition and Sustainable Development: For the establishment and development of sustainable, high-performing, and sovereign digital infrastructures, in line with energy and climate challenges (Green Data Centers).”
The fact recorded is the signature of the agreement. No data centre built under it is documented in the registry.
-
MAI-EV-0019VERIFIED FACT
Agreements signed in Salé on the sidelines of the First National AI Conference
On 2 July 2025 in Salé, on the sidelines of the First National AI Conference, the Ministry of Digital Transition signed: a memorandum for an Al Jazari Institute centre of excellence in Nador with the Minister of Higher Education, Scientific Research and Innovation and Oriental Region authorities; a data-centre partnership memorandum with the President of UM6P; and an agreement with the Minister of Energy Transition and Sustainable Development.
“Several agreements were signed, on Wednesday in Salé, during a ceremony held on the sidelines of the First National Conference on AI.”
“A MoU for the creation of an "Al Jazari Institute" Center of Excellence in the province of Nador was also signed between Seghrouchni and the Minister of Higher Education, Scientific Research and Innovation, Azzedine El Midaoui, the Wali of the Oriental Region, Khatib El Hebil, the governor of the province of Nador, Jamal Chaarani and the President of the Regional Council, Mohamed Bouarourou.”
“a MoU marking the launch of a strategic partnership in the field of data centers was signed between Seghrouchni and the President of Mohammed VI Polytechnic University (UM6P), Hicham El Habti.”
“An agreement was also signed between the Minister in charge of Digital Transition and Administrative Reform and the Minister of Energy Transition and Sustainable Development, Leila Benali.”
Page dated Thursday 3 July 2025; "Wednesday" is 2 July 2025. This source names the signatories that the ministry's synthesis report (MAI-EV-0005 to MAI-EV-0007) describes only in general terms. The conference itself is reported as held in Rabat (MAI-EV-0004); the signing ceremony is reported in Salé.
03Record history
In the registry since v0.1.0. Changes to this entry, newest first; they describe the record, not events. All versions: evidence changes.
- v0.6.0 Description revised Sovereign green data-centre infrastructure agreement: description revised (status).
- v0.6.0 Supporting records changed Sovereign green data-centre infrastructure agreement: supporting records changed. On MAI-EV-0045.
- v0.2.0 Relationship evidence changed Ministry of Energy Transition and Sustainable Development signatory of Sovereign green data-centre infrastructure agreement: relationship evidence changed. On MAI-EV-0019.
- v0.2.0 Lifecycle stage first recorded Sovereign green data-centre infrastructure agreement: lifecycle stage first recorded as announced. On MAI-EV-0006, MAI-EV-0019.
- v0.2.0 Property first recorded on an existing entity Sovereign green data-centre infrastructure agreement: property first recorded on an existing entity (project kind).
- v0.2.0 Supporting records changed Sovereign green data-centre infrastructure agreement: supporting records changed. On MAI-EV-0019.
04Machine-readable